
1 - Before the rebuild |

2 -
Turned into a pickup |

3 - Framework in place |

4 -Walls mounted |

5 -Paneling
finished |

6 -
Galley and cabinets |

7 -Closed the backdoor |

8 -
Bodypainting |

9 -
Windows
finally |

10 -
Last day |

11 -
Home at last |

12 -
First trip after rebuild |
First stage in the
rebuild was finished Friday 29
October 2004 !
As
soon as the rebuild was finished, there was time to make the first
test, pictures
here.
There has been times when I have told
my self that this is "too much", but seeing the vehicle now, makes
me confident that this is exactly what I had in mind a few weeks
back. So try to imagine the excitement on bringing her back on the
road
Phase II - Enhancements, more equipment
Second "major" drill on Betsy started 27 May 2005 and is due to my
continues of tests during the last months. I decided to change the
interior to get more storage space inside. Also trying to organize
it in a way that I am able to use most of the cabinets when the car
is packed for travel. My excellent Oz-tent that is my "guest lodge"
will be stored in a separate tunnel. This is done to conserve the
aluminum parts that can easily be bent when stepped on (which
already has happened). I am also building a separate computer
cabinet, shelves for books and paper and more storage room for tools
and spare parts. |